200字范文,内容丰富有趣,生活中的好帮手!
200字范文 > 无锚碇墙和拉杆 without anchored retaining wall by tie rods英语短句 例句大全

无锚碇墙和拉杆 without anchored retaining wall by tie rods英语短句 例句大全

时间:2021-06-16 23:27:35

相关推荐

无锚碇墙和拉杆 without anchored retaining wall by tie rods英语短句 例句大全

无锚碇墙和拉杆,without anchored retaining wall by tie rods

1)without anchored retaining wall by tie rods无锚碇墙和拉杆

2)anchored quay wall锚碇墙码头

3)anchor retaining wall锚杆挡墙

1.Based on the stability analysis of the slope,field investigation,lab tests and the comparisons among several support schemes,it was tested thatanchor retaining wall is the most reasonable and economical support scheme.5m,需做永久性支护,通过现场勘察、室内试验的信息采集、稳定性分析及支护方案的比较认为,锚杆挡墙是该边坡最合理和经济的支护方案,已被建设方和质检部门采用和实施。

英文短句/例句

1.Vertical Pre-stressed Anchor Rod Retaining Wall in Project Application垂直预应力锚杆挡墙在工程中的应用

2.Achor rod retaining wall support system dedeep excavation sign point锚杆挡墙支护技术在深基坑的应用和设计研究

3.The application of normal construction method plate lux type anchor retaining wall in a side slope engineering顺作法板肋式锚杆挡墙在某边坡工程中的应用

4.This paper describes the design, constructin and monitoring of a retaining wall with vertical prestressed anchors at Lion-Hill in the suburbs of Chengtu.本文描述在成都郊区狮子山一座竖向预应力锚杆挡墙的设计、施工和长期观测情况。

5.Earth Pressure and Stability Analysis of Retaining Walls and Anchors土压力及挡土墙和锚杆的稳定性分析

6.The Study of a New Support Technology-The Vertical Prestressed Anchored Cement Soil Wall;垂直预应力锚杆式水泥挡墙支护技术研究

7.Study on Computer Assistant Design for the Retaining Wall of Anchor;锚杆式挡土墙计算机辅助设计系统的研究

8.Application of Technology for Reinforcement with Anchored Bolt in Realignment of Diseases in Railway Retaining Walls锚杆加固技术在铁路挡土墙病害整治中的应用

9.The Application of Pre-stressed Anchoring Bar for Reinforcing Retaining Wall预应力锚杆在挡土墙加固工程中的应用

10.Application of anchor breast wall with anchorage tensile pile foundation in filling project near the existing retain wall锚拉桩基础锚定板挡墙在临近已建挡墙填方工程中的应用

11.Reinforcement Technology of Sprayed Concrete with Bar Nets and Anchor Grouting on Failure Earth Retaining Walls失稳加筋土挡土墙喷网锚注加固技术

12.Construction technology of slope retaining wall and cable-anchored anti-slide pile边坡挡土墙与锚拉式抗滑桩施工技术

13.On the application of the bolt or boltmesh in the composite soil nailing walls with bolts or boltmesh锚杆(索)复合土钉墙中锚杆(索)的应用探讨

14.An Utility Analysis of the Combined Actions of Soil Anchors and Earth-retaining Pile Wall for Real Projects;土层锚杆和挡土排桩共同作用的工程实用分析

15.Construction quality supervision of composite construction combined with anti-slide pile and anchor bolt frame wall抗滑桩加锚杆框架墙组合式施工的质量监理

16.Model test on bearing behavior of pile-wharf structure without anchored retaining wall by tie rods or batter piles无锚碇墙拉杆的直桩码头受力性状模型试验

17.Construction of Cutoff Wall with Self-Setting Mortar of the Outside Curtain in Southern Anchorage Foundation of the Yangluo Bridge武汉阳逻长江大桥南锚碇工程外围挡水帷幕自凝灰浆防渗墙施工

18.Optimization Design Study of Prestressed Ground Anchor Cable Anti-slide Pile Reinforcing Constructed Retaining Wall预应力锚索抗滑桩加固既有挡墙的优化设计研究

相关短句/例句

anchored quay wall锚碇墙码头

3)anchor retaining wall锚杆挡墙

1.Based on the stability analysis of the slope,field investigation,lab tests and the comparisons among several support schemes,it was tested thatanchor retaining wall is the most reasonable and economical support scheme.5m,需做永久性支护,通过现场勘察、室内试验的信息采集、稳定性分析及支护方案的比较认为,锚杆挡墙是该边坡最合理和经济的支护方案,已被建设方和质检部门采用和实施。

4)anchorage[英]["??k?r?d?][美]["??k?r?d?]锚碇

1.Test study on mechanism of shear-slip ofanchorage in suspension bridge;悬索桥锚碇剪切滑移的机理及试验初探

2.Design and construction ofanchorage system for steel cofferdam;泸州长江大桥主墩钢围堰锚碇系统的设计与施工

3.Finite Element Analysis on the Temperature Field of the Massive Concrete Anchorage of Haicang Bridge海沧大桥大体积混凝土锚碇温度场有限元分析

5)anchor[英]["??k?(r)][美]["??k?]锚碇

1.As an important part of supporting structure,anchoring controls the project progress of suspension bridge.锚碇作为承力结构的重要部分,是悬索桥的重点控制性工程。

2.The paper introduces the experience of applying D-B model to the construction of the southanchor of Wuhan Yangluo Changjiang Highway Bridge.介绍武汉阳逻长江公路大桥南锚碇工程采用设计-施工总承包模式的经验,对相关的招标和项目管理工作进行总结。

3.Engineers made 2 plans for position of prestressed steel pipes of the northanchoring system of Wuhan Yangluo Changjiang River Road Bridge.武汉阳逻长江公路大桥北锚碇锚固系统预应力钢管定位,采用了门式桁架初步固定预应力钢管、安装过程中用全站仪测量,并通过微调装置控制的方法。

6)anchor mound锚碇

1.The main steps to prevent temperature crack inanchor mound mass concrete of Changjiang River Bridge in Yichang are described, and all kinds of temperature control methods and effect was present.介绍了宜昌长江大桥锚碇大体积混凝土施工防止温度裂缝的主要过程 ,并对各种温控措施及其效果进行了评述 ,证明所采取的措施是行之有效和切合实际的。

2.In this paper,the result of mass concrete temperature monitoring Haicang Bridge eastanchor mound is introduced.介绍了海沧大桥东锚碇大体积混凝土的温度监测结果,结合温控标准研究温控措施的效果。

3.It is described that the main regulative steps of temperature to prevent slits in the enormous concreteanchor mound construction that is in rock of deep base pit in the south bank of Changjiang River Bridge in Jiangying.介绍了江阴长江大桥南锚碇深基坑嵌岩锚大体积混凝土施工防止裂缝的主要温控措施。

延伸阅读

拔碇1.拔起船碇。比喻舍此他适。

本内容不代表本网观点和政治立场,如有侵犯你的权益请联系我们处理。
网友评论
网友评论仅供其表达个人看法,并不表明网站立场。