200字范文,内容丰富有趣,生活中的好帮手!
200字范文 > 泥水平衡顶管 Mud-water balance pipe jacking英语短句 例句大全

泥水平衡顶管 Mud-water balance pipe jacking英语短句 例句大全

时间:2018-11-30 20:28:26

相关推荐

泥水平衡顶管 Mud-water balance pipe jacking英语短句 例句大全

泥水平衡顶管,Mud-water balance pipe jacking

1)Mud-water balance pipe jacking泥水平衡顶管

英文短句/例句

1.The Application Technology of Slurry Balance Pipe Jacking Equipments in Underground Pipeline Construction地下管线施工中的泥水平衡顶管设备应用技巧

2.Settlement Regularity and Control in Large Diameter Long-distance Curve Slurry Pipe Jacking Construction大直径长距离曲线泥水平衡顶管施工沉降控制

3.Application of balance method of slurry and water in construction of long-distant jacking-pipe泥水平衡法在长距离顶管施工中的应用实践

4.Construction Technology for Large Diameter Slurry Shield TBM Closely undercrossing Sewage Pipe大直径泥水平衡盾构近距离下穿污水管施工技术

5.poise a water jug on one"s head使水罐在头上保持平衡,把水罐平衡地顶在头上

6.Launching Technology of Super-diameter Slurry-pressure-balance TBM超大直径泥水平衡式盾构机始发技术

7.Technical Specifications for Purchasing Slurry Shield Machine泥水平衡盾构机采购技术条件(续)

8.Construction Scheme and Technical Characteristics of Air-pressure Balance Long-distance Steel Pipe Jacking气压平衡长距离钢管顶管施工方案及技术特点

9.Automatic pivoting sand scraper with counterweight, cement loading manual or with silo, and screw conveyor.自动链板刮沙机,带平衡块,水泥人工加入或水泥筒仓和螺旋输送机。

10.He walked along with a jug poised on his head.他头上顶着一个水罐, 保持着平衡往前走。

11.Numerical simulation of moisture balance in evapotranspiration landfill cover垃圾填埋场ET封顶系统水分平衡数值分析

12.The effect of water-block for the bearing structure in main roof rocks due to mining in steep long-wall seam急倾斜长壁工作面开采老顶平衡结构阻水性能

13.Numerical Simulation and Analysis of the SPB Shield Tunnel Construction in Soft Soil Stratums;软土地层泥水平衡盾构施工数值模拟分析

14.The balance analysis of the sludge blanket height for wangxiaoying wastewater treatment plant in hefei合肥市王小郢污水处理厂二沉池泥位平衡分析

15.Three-Dimensional Nonlinear Simulation of Super-Large Slurry Balance Shield Tunnel Construction Process超大型泥水平衡盾构施工的三维非线性模拟

16.Energy-balance and Analysis and Calculation during Pyrolysis of Coal Water Slurry煤泥水热解过程中的能量平衡分析与计算

17.Construction Technology for Large Diameter Slurry Shield TBM Closely undercrossing Ventilation Shaft大直径泥水平衡盾构近距离穿越风井施工技术

18.On Control Technique for Mix-shield Tailskin Protection关于泥水平衡盾构机盾尾保护的控制技术

相关短句/例句

sludge-liquid balance method泥水平衡顶管法

3)Pipe-pushing by soil-water balamce method泥水平衡式顶管

4)sludge-water balanced mechanical jack-in method泥水平衡式机械顶管

1.The application of large-bore (Φ2270 mm) pipeline manufactured with new material of grit-mixed glass fiber reinforced plastic in sewage network construction of Guangzhou is introduced, usingsludge-water balanced mechanical jack-in method for long distance advancing in areas of silt and mud deposition.主要介绍了在广州市的污水管道工程建设中,采用泥水平衡式机械顶管施工法,对大口径(Φ2270mm)的新型材料玻璃钢夹砂管在淤泥、淤泥质细砂地质地区进行长距离顶进的施工情况,并就顶管工程中重要的技术参数之一轴向应变进行了监测与分析。

5)Soil and Water Balanced Top Pipe Project泥水平衡顶管工程

6)large diameter slurry pipe jacking大直径泥水平衡顶管

1.At present thelarge diameter slurry pipe jacking is the preferred construction method in project of urban water supply and drainage pipe and electric power pipe.目前,大直径泥水平衡顶管掘进已成为城市给排水水管、电力管线工程等首选的施工方法。

延伸阅读

顶管顶管pipe jackingd ingguon顶管(pipe jaeking)将需埋设的地下管道在工作坑内直接顶入土层中的暗挖式施工方法。可用于工技术的发展。美国在不用中继接力环的情况下顶进在软土地区施工地下管道穿越铁路、公路、湖泊河流及距离达到588m,德国在使用中继接力环的情况下创造建筑物等。顶管按顶进方向木同分为水平顶进和垂直出1210m的长距离顶管记录。上海宝山钢铁总厂3条顶进;按挖土方式不同,分为机械开挖顶进,挤压顶进,直径为3m、长约180m的进水钢管管道采用泥浆套顶水力机械开挖顶进和人工开挖顶进;按顶进长度分为管法施工。1986年上海顶进穿越黄浦江的煤气管道的一般顶管和长距离顶管。一般顶管的顶进距离通常不直径为2.4m、总长694m,是当时国内顶进距离最长超过10om,适用于城市排水工程施工。长距离顶管的的顶管工程。1981年英国研制出蛆叫式顶管新技术,顶进距离长达数百米甚至上千米,一般用于穿越江、日本将遥控技术应用到顶管法中,通过闭路电视和各河、湖、海底部的工程施工。长距离顶管常以中继接力种仪表进行遥控操作。由于顶管施工技术的不断发展,分段顶进。顶管常用的为钢筋混凝土管和钢管。根据工歉,2洲··\一.,:下巍1尸户沪作坑(井)尺寸和起吊设备能毅二qZJ///艺__瘾葵壑蘸夔痊些夔蝗蛋夔邑百命场尹毯尼丝生自魏酬力确定每节管子长度。钢管未可朽趋蓦酬用日翻蕉鑫囊童奎鑫:奎奏羹奎鑫颤冒认燕刃荀套萄襄羹羹葬接头通常在工作坑(井)内焊戮羚鸳到玛粼泳绎二鸯毖本鬓与蛾当祥车J公堤接。钢筋混凝土管接头一般L汾之汾勒瓜晶狱淤.一;汰二‘;公二‘磷漏习采用带有钢外套环的平接式,外套环可以固定在管的顶管施工示意图一端,也可以不固定。接头采1一后座;2一调整垫;3一后座支架;4一千斤顶支架;5一主千斤顶;6一刚性顶铁;7一u形用环形防水密封圈形式。顶顶铁;8一环形顶铁.9一导轨;1。一预埋板;11一管道;12一穿墙止水;13工作井井壁。14-管法施工设备有顶进设备密封圈;巧一中继环;16一中继千斤顶;17一工具管(如千斤顶、后座、顶铁和导轨等)、出土设备(根据挖土方式而定,如吸泥机、切又出现了许多特种顶管方法,例如平列式顶管、垂直顶削盘等)和其他设备(如中继接力环、泥浆配制供给设管,大型箱涵顶进等。备等)。参考书目 顶管施工前开挖工作坑‘井),并在工作坑内做后.、,_矜更牛产大同编,软土地基与地下工程,中国建筑工业__二__.二_‘__乙一_一万、_‘_一_一‘、二丁厂.’’.几一丁’~二一出版社,北京,1984。座(后背)和安设导向设施。工作坑是进行卸管、接管、一‘一’一‘一‘”----一__、二、。二瓜、,二二一;’二一:三几_:三二一二二几二丫二介.1、’(仰正国)安设顶进设备和出土等的工作场所。管节卸入工作坑’‘’-一‘后,通过传力顶铁和导向轨道,用支承在基坑后座上的液压千斤顶将管节顶入土层中,同时在管内取土。

本内容不代表本网观点和政治立场,如有侵犯你的权益请联系我们处理。
网友评论
网友评论仅供其表达个人看法,并不表明网站立场。